Building Permit Costs in Ontario

How much should you budget? Complete guide to permit fees across GTA municipalities.

$150 - $500

Typical deck permit

$400 - $1,500

Basement finishing

$800 - $3,000+

Room addition

How Permit Fees Are Calculated

Ontario municipalities calculate building permit fees based on:

1. Base Fee

A minimum fee that applies to all permits, typically $150-$200 for residential projects.

2. Construction Value Rate

An additional fee per $1,000 of construction value (typically $10-$13 per $1,000). For example: A $15,000 deck × $12/thousand = $180 + base fee.

3. Plan Review Fees

Some municipalities charge additional fees for plan examination, typically included in the base fee or charged separately (5-10% of permit fee).

Permit Fees by City (2025)

CityBase FeePer $1,000Deck Est.
Toronto$195.51$12.47$200 - $500
Mississauga$161.00$11.94$150 - $400
Brampton$175.00$12.00$175 - $450
Vaughan$165.00$11.50$165 - $400
Markham$180.00$12.25$180 - $450
Oakville$170.00$11.75$170 - $425

* Estimates are approximate and based on typical construction values. Actual fees depend on your specific project. Fees subject to annual increases.

Detailed Fee Breakdown by City

Deck Permit

$200 - $500

Basement Finish

$500 - $1,500

Addition

$1,000 - $3,000+

Note: 4% annual increase. Fees based on construction value.

Mississauga

Official fees

Deck Permit

$150 - $400

Basement Finish

$400 - $1,200

Addition

$800 - $2,500+

Note: Minimum fee applies. Plan review fees additional.

Deck Permit

$175 - $450

Basement Finish

$450 - $1,300

Addition

$900 - $2,800+

Note: Fees include plan examination. Inspections included.

Deck Permit

$165 - $400

Basement Finish

$400 - $1,200

Addition

$850 - $2,600+

Note: Development charges may apply for additions.

Deck Permit

$180 - $450

Basement Finish

$450 - $1,300

Addition

$900 - $2,700+

Note: Online applications receive 5% discount.

Deck Permit

$170 - $425

Basement Finish

$425 - $1,250

Addition

$875 - $2,650+

Note: Fees adjusted annually based on CPI.

Don't Forget These Additional Costs

The permit fee is just one part of your project budget. Factor in these common expenses:

BCIN Designer Fees

$500 - $2,500+

Required for most residential permits. Designer draws plans and stamps Schedule 1.

Engineer Stamp (if required)

$300 - $1,500+

Needed for structural modifications, load-bearing walls, or complex designs.

Survey / Plot Plan

$500 - $1,500

May be required if you don't have a current survey or for properties near lot lines.

Zoning Variance Application

$1,500 - $5,000+

If your project doesn't meet zoning requirements, you'll need a variance.

Development Charges

Varies widely

For additions that increase floor area. Can be $10,000+ in some municipalities.

Example: Total Cost for a Deck Project

Here's a realistic budget breakdown for a $15,000 deck project in Toronto:

Building permit fee$350
BCIN designer (drawings)$800
Survey (if needed)$600
Total permit-related costs$1,750

This is approximately 12% of the construction cost. Budget 10-15% of your project value for permit-related expenses.

Tips to Reduce Permit Costs

Submit a complete application the first time to avoid re-submission fees
Apply online if your municipality offers a discount (Markham offers 5%)
Get quotes from multiple BCIN designers - prices vary significantly
Use your existing survey if it's recent and accurate
Ask about permit fee exemptions for small projects
Time your application before annual fee increases (usually January)

Ready to Apply?

Don't waste money on resubmission fees. Our free pre-check catches common issues before you submit.

Run Free Pre-Check

Fee information is approximate and based on publicly available municipal fee schedules as of December 2025. Fees are subject to change. Always verify current fees with your local building department.